Bottom paint Tuesday

The clock is ticking with just 6 days left until our scheduled launch it is time to break out the respirator and bottom paint materials.  Today we had ideal weather for painting. The temperature was in the low 60's. So it was warm enough to paint comfortably but not so hat the paint evaporates of your brush.  

Gloves, paint sticks, respirator, and grimy clothes. 



I start the bottom by cutting in the water line with a paint brush.  I use the disposable foam brushes because nothing I dip in VC-17 is coming home. 


Then I roll on the first coat of paint. 

 Two coats later and two hours I have a nice sleek copper bottom. 

Comments

Popular posts from this blog

Building a Spinnaker Sock DIY

Main sail rigging

A removable compression post